MileStones

2003 to 2005

Incorporated as PREMIER TOOLING SERVICES, Invested in Micro Hole EDM Technologies &
CNC EDM with Robotizing system

2006

Invested in Robot for unmanned operation in high speed machining equipment in hardened machining. Converted to Private Limited company:- PRE-TECH SOLUTIONS SDN BHD

2007 to 2008

Invested in high end CAD-CAM capable of doing multi axis machining. Invested in latest highspeed machining and CNC EDM with automation and multi Robot system.

2008

Awarded ISO 9001:2000 Certification

2009

Invested in high speed MIKRON HSM 400U(5 AXIS)

2010 to 2011

Expanding / Shifted to new factory at Bayan Lepas, Penang. (15,000 sq ft), Invested in Advance Coordinate measuring machines with integrated multiple sensors

2012 to 2013

Invested high speed CNC milling for graphite machining, Invested more 3 axis CNC milling capacities.

2014

Invested 3 axis high speed CNC milling for Copper Ele making, Soldick CNC Wire cut machine

2015 to 2016

Invested Moriseiki TurnMill 9 axis machine- NTX2000, DMG 5 axis machine – DMU EVO40 & DMU50 Wenzel CMM measuring machine, CAM with 9 axis machining capabilities

2017

Awarded AS 9100 Certification

PRE-TECH
Quick Info:

Pre-Tech Solutions Sdn Bhd (733803-W)
No. 2A, Solok Beringin 1, Batu Maung, 11960 Bayan Lepas, Penang, Malaysia.

GPS:  5°16'58.5"N 100°16'25.3"E

Mr Cheng
Email:
enquiry@pre-techsolutions.com


Phone:
+604 240 4835
+6012 472 5688 (mobile phone)

© Copyright 2023 Pre-Tech Solutions Sdn Bhd - All Rights Reserved.
Managed by 1web.my

Designed with ‌

HTML Generator